Frame 9 Parts

Frame 9 Parts

The first General Electric ® MS9001 (Frame 9) Series Turbine unit reached the field in 1975.   With revisions and upgrades along the way, hundreds of these units remain in operation in diverse environments throughout the globe today. WWGTP can supply a wide range of...
Frame 7FA Parts

Frame 7FA Parts

The first MS7001FA  (Frame 7FA) General Electric ® Turbine Unit reached the field in 1993.   Its versatile design allows for both Simple Cycle (Gas) and Combined Cycle (Gas & Steam) configuration. Over 25 years and various upgrades and revisions later, hundreds of...
Frame 7EA Parts

Frame 7EA Parts

The first General Electric ® MS7001EA (Frame 7EA) Series turbines began operating in the field over 40 years ago. With revisions and upgrades along the way, hundreds of these units remain in operation in diverse environments throughout the globe. WWGTP can supply a...
Frame 6FA Parts

Frame 6FA Parts

    The first MS6001FA  (Frame 6FA) General Electric ® Turbine Unit reached the field in 1996.   Its versatile design allows for both Simple Cycle (Gas) and Combined Cycle (Gas & Steam) configuration. Over 25 years and various upgrades and revisions...
Frame 6B Parts

Frame 6B Parts

The first MS6001 Series (Frame 6) General Electric ® Turbines reached the field in 1978, and were soon followed in 1981 by the upgraded MS6001B (Frame 6B).  Some 40 years and several upgrades and revisions later, hundreds of these units continue operating in diverse...
Frame 5 Parts

Frame 5 Parts

The first MS5001 Series (Frame 5) General Electric ® Turbines reached the field in 1957.  60 years and several upgrades and revisions later, hundreds of units continue operating in diverse environments across the globe. WWGTP can supply a wide range of Frame 5 Parts....